Design of Cabling of Clock and Emergency Telephone System, Installation of Clock and Telphone and Cabling Work for Adding New Stations in Miaoli, Changhua and Yunlin
Taiwan High Speed Rail 
2015/1 Fullring implemented the creating of planning and design of the system, installation work and completion documents.




Installation of the short circuit detectors and cable wiring connection between the switch machine control boxes at whole line
Taiwan High Speed Rail
2013/6 Fullring implemented installation of the short circuit detectors and cable wiring connection between the switch machine control boxes at whole line of Taiwan High Speed Rail.




Taiwan High Speed Rail /raelizing ideal track condition for high level of ride quality
Taiwan High Speed Rail
2013/4 Fullring implemented measuring levelness, a perpendicularity and so on with the shortwave and the longwave bowstring method and collected actual data of track.And raelized ideal track condition for high level of ride quality